PL1

IVE: Connection group not properly loaded

In the attached project, the connection between hk-service and acceptance-hk are all in a connection group. But are not when being loaded.

Assignee Loading
Time tracking Loading

Provided with ❤️ by esait | 📜 Terms of Service | 📊 Live metrics | 📝 Our Documentation | 💬 Need assistance? esait.service.desk@esa.int